U

User

user@klinflow.com

Production Inventory Ledger

Traceable history of all raw materials consumed and finished goods produced.

Timestamp Product Item Move Type Warehouse Qty Change Costing
Mar 12, 2026 16:26

Smart LED Bulb (Finished)

SKU: FG-LED-001

production output Dhaka South 0.00 pcs ৳ 0.00
Mar 12, 2026 16:25

DEMO: Stealth SmartWatch V1

SKU: DEMO-FG-01

production output Dhaka north +50.00 pcs ৳ 0.00
Mar 12, 2026 16:10

DEMO: Watch Core Module

SKU: DEMO-RM-01

material issue Production Floor -200.00 pcs ৳ 0.00
Mar 12, 2026 16:10

DEMO: Silicon Strap Set

SKU: DEMO-RM-02

material issue Production Floor -200.00 pcs ৳ 0.00
Mar 12, 2026 16:10

DEMO: Glass Screen Protector

SKU: DEMO-RM-03

material issue Production Floor -210.00 pcs ৳ 0.00
Mar 12, 2026 16:10

DEMO: Premium Box Packaging

SKU: DEMO-RM-04

material issue Production Floor -200.00 pcs ৳ 0.00
Mar 12, 2026 15:55

DEMO: Watch Core Module

SKU: DEMO-RM-01

adjustment Material Store (A) +1,000.00 pcs ৳ 0.00
Mar 12, 2026 15:55

DEMO: Silicon Strap Set

SKU: DEMO-RM-02

adjustment Material Store (A) +2,000.00 pcs ৳ 0.00
Mar 12, 2026 15:55

DEMO: Glass Screen Protector

SKU: DEMO-RM-03

adjustment Material Store (A) +1,500.00 pcs ৳ 0.00
Mar 12, 2026 15:55

DEMO: Premium Box Packaging

SKU: DEMO-RM-04

adjustment Material Store (A) +5,000.00 pcs ৳ 0.00
Mar 11, 2026 13:44

Plastic Pellets (A-Grade)

SKU: RM-PL-001

material issue Main Warehouse -27.50 kg ৳ 1,237.50
Mar 11, 2026 13:44

Copper Wiring (0.5mm)

SKU: RM-CW-001

material issue Main Warehouse -100.00 m ৳ 1,250.00
Mar 11, 2026 13:44

LED Logic Chips (V2)

SKU: RM-LC-001

material issue Main Warehouse -500.00 pcs ৳ 4,000.00
Mar 11, 2026 13:44

Glass Bulb Housing

SKU: RM-GB-001

material issue Main Warehouse -500.00 pcs ৳ 7,500.00
Mar 11, 2026 13:44

Smart LED Bulb (Finished)

SKU: FG-LED-001

production output Main Warehouse +500.00 pcs ৳ 55,000.00